Reference price: US $920 - 1080 / ton FOB Qingdao

220kV Double Circuit Tension and Angle Steel Transmission Tower for Overhead Line

220 kV double circuit tension tower in Q355B with heavy 100 micron galvanizing and six conductor arms, engineered for high wind and ice load cases, foundation stubs included.

SKU: IT-002 Category:
Send Inquiry

Tell us the grade, size and quantity you need, and we will quote accordingly.

Product Specifications

SKUIT-002
Model220 kV J1 tension angle tower
StandardGB/T 1591 Q355B, Q345B
TechniqueHot Dip Galvanized, Welded Fabrication
ShapeTower Structure
CertificateBV, EN 10204 3.2, ISO 9001
ApplicationConstruction, Infrastructure, Transmission Tower
Size220 kV / height 35 - 75 m / double circuit 6 conductor arms
LengthMade to drawing / max single member 12 m
SurfaceHot dip galvanized / zinc coating 100 - 140 microns
MOQ1 set / approx 35 tons
SampleGalvanized joint sample free / freight collect

Product Overview

This 220 kV double circuit tower uses Q355B micro-alloyed steel for the main legs, with back-to-back angle assemblies over 200 mm wide butt welded with gusset plates at the joints to raise shear capacity. Six conductor arms keep phase spacing safe through the angle point, and the body carries three maintenance platforms and a full climbing ladder. The whole tower is heavily galvanized at 100-140 microns for coastal salt spray and industrial atmospheres.

Specifications

Parameter Value
Voltage class 220 kV double circuit
Tower type Tension / angle tower (0 – 60 degrees)
Tower height 35 m – 75 m
Base width 5 m – 12 m
Main member Q355B / Q345B built-up angle
Conductor arms 6 (three levels each side)
Zinc coating 100 – 140 microns
Design ice load 10 – 20 mm
Basic wind speed 30 – 38 m/s
Seismic level 8 degree

Applications

Supplied for tension sections and angle points on 220 kV trunk lines and for compact double circuit upgrades of urban transmission corridors. Past projects include transmission works in Pakistan, hydro power evacuation lines in Ethiopia, a dedicated mine power line in Chile and cross-border interconnection schemes in Southeast Asia.

Packing / Delivery / Payment

Packed tower by tower, with long members braced by timber and protected at the ends, and foundation stubs and base plates boxed separately and marked by foundation number. Loaded in 40HQ containers or break bulk. Lead time is 45-60 days. Payment by L/C at sight or T/T with 30% deposit. We issue EN 10204 3.2 witnessed certificates, BV inspection reports, zinc coating thickness records, packing list and Certificate of Origin.

Scroll to Top