Reference price: US $850 - 980 / ton FOB Qingdao

110kV Hot Dip Galvanized Lattice Steel Transmission Tower with Bolted Angle Members

110 kV bolted lattice transmission tower, lofted to your drawings, CNC punched and hot dip galvanized to 86 microns minimum, shipped knocked down with every member marked.

SKU: IT-001 Category:
Send Inquiry

Tell us the grade, size and quantity you need, and we will quote accordingly.

Product Specifications

SKUIT-001
Model110 kV tangent suspension tower
StandardASTM A572 Gr.50, Q345B
TechniqueHot Dip Galvanized, Welded Fabrication
ShapeTower Structure
CertificateISO 9001, SGS, Third-Party Inspection
ApplicationInfrastructure, Transmission Tower
Size66 kV - 220 kV / tower height 25 - 60 m / base width 3 - 8 m
LengthMade to drawing / shipped knocked down in sections
SurfaceHot dip galvanized / zinc coating 86 - 120 microns
MOQ1 set / approx 25 tons
SampleGalvanized member sample 300 mm free of charge

Product Overview

This is a four-legged self-supporting lattice tower in which main members are Q345B and bracing is Q235B, lofted either from your drawings or from our standard tower family. Members are CNC cut and punched on multi-station presses with a hole pitch tolerance of +/-1 mm, so the crew on site bolts the tower together without reaming holes. The complete tower is acid pickled and hot dip galvanized to 86-120 microns, giving three decades of corrosion protection. Every member is steel stamped with its section number and shipped with matching galvanized bolts, step bolts and clamps.

Specifications

Parameter Value
Voltage class 66 kV – 220 kV
Tower type Suspension / tension / angle tower
Tower height 25 m – 60 m
Base width 3 m – 8 m
Main member grade Q345B / A572 Gr.50
Bracing grade Q235B / SS400
Zinc coating min 86 microns (ASTM A123)
Connection bolts M16 – M24 hot dip galvanized grade 6.8
Design wind speed 27 – 35 m/s
Design code GB 50665 / ASCE 10-97 / IEC 60826

Applications

Used for new build and reinforcement of 66 kV to 220 kV overhead lines, including rural grid extension in Nigeria, mine site power lines in DR Congo, island interconnection in the Philippines and urban network upgrades in Bangladesh. Substation gantries and railway traction substations use the same fabrication.

Packing / Delivery / Payment

Packed tower by tower: main members strapped in bundles, small parts in wooden cases with a detailed packing list, shipped knocked down in 40HQ or open top containers with erection drawings and a member number schedule. Lead time is 30-45 days including galvanizing. Payment by L/C at sight or T/T with 30% deposit. We supply EN 10204 3.1 mill certificates, zinc coating thickness reports, SGS pre-shipment inspection, packing list and Certificate of Origin.

Scroll to Top